New loader GIA Haggloader 9 HR

New loader GIA Haggloader 9 HR

Contractor has provided during October regarding  the realization of the mining works a new mining track loader, which should replace at work the previously used type of loader Haggloader 8 HR. The new loader  has besides a track undercarriage also caterpillar undercarriage. The new facility should simplify in the phase of rail tunnel tunneling the realization of certain operations in the underground and in conjunction with more flexible single-arm dipper it should accelerate the work tempo at the mining works realization. The contractor plans to use this equipment also at the realization of the follow-up of mining works, which realization will follow after completion of the access tunnel to the bearing tunneling.

 

 novy_nakladac4_1.JPG                       novy_nakladac5_1.JPG

  GIA Häggloader 9 HR

2007 © vskmining.sk | webdesign © bart.sk